Tornio
Operational

Arctio West

Area size, ha
0
Available Power, MW
0
Available capacity at grid point, MW
0
Available Plots, PC
0

Arctio West offers excellent opportunities to establish in the industrial ecosystem of the region. The ready-to-go site plan and nearby infrastructure enable a quick start.

The area also provides the partners you need when your project moves from planning to construction. Tornio’s steel and construction professionals are able to implement even large projects cost-effectively, but with particularly high quality in northern conditions.

Interactive map of industrial site

Site key figures

Basic Site Information

Total Area, ha32
Largest Individual Plot, ha
Number of Plots10
Site Type, Greenfield / BrownfieldBrownfield / Greenfield

Zoning status

Current ZoningChemical Zoning
Chemical Zoning Initiated (Yes/No)Yes
Estimated Completion of Zoning Plan (MM/YYYY)

Electricity Grid

Available Electrical Capacity, MW20
Grid Voltage, kV110 kV
Distance to Main Grid Connection Point, km15
Available Capacity at Connection Point, MW500
Is Grid Reinforcement Planned?Yes
Estimated Completion (Month – Year)

Water Availability

Available Water Volume, m³/year
Distance to Freshwater Source, km1 km
Distance to Seawater, km5 km

District Heating

Maximum District Heating Capacity, MW50 MW
Distance to District Heating Network, km1 km

Logistics

Distance to Primary Port, km5
Primary Port Draft, m9,5 m
Primary Port NamePort of Röyttä (Tornio)
Distance to Secondary Port, km36 km
Secondary Port Draft, m12,5 m
Secondary Port NamePort of Ajos
Distance to Railway, km0
Possibility to Build a Railway Connection, Yes / NoYes

Distance to Transmission Infra

Documents

Contact for more information

Tero SiivolaCEO, Business Tornio Oy+358 40 358 5888[email protected]
Link to site website

Industry news

Join us in Sea-Lapland for high-level event aimed at accelerating hydrogen economy investments and building a coordinated regional ecosystem. Sea-Lapland is entering a new phase of hydrogen and P2X development, with major industrial players, municipalities and infrastructure operators working together to build a coordinated ecosystem. This event offers direct access to the people shaping that process and the information needed for future investment decisions. Please list your areas of interest for the afternoon Meet & Greet session when registering, so we can tailor the discussions to your needs. As soon as the agenda is finalised, we will share it with all participants. At this stage, please note that the departure from Oulu for the site visit is at 7:30, in front of the famous Toripoliisi statue. The return to Oulu will be no later than around 16:30.

Digipolis

See other Industrial Sites

View all
In planning
Tornio
96 ha
250 Mw
Operational
Tornio
32 ha
20 Mw
In planning
Tornio
150 ha
0 Mw
Operational
Keminmaa
45 ha
0 Mw
In planning
Kemi
350 ha
0 Mw
Operational
Kemi
190 ha
10 Mw
Operational
Kemi
70 ha
20 Mw
In planning
Simo
100 ha
0 Mw
Under construction
Simo
22 ha
0 Mw
In planning
Tervola
100 ha
5 Mw
In planning
Keminmaa
35 ha
0 Mw